10/23/2026
Thats a wrap on this bad boy!
This job was very difficult over 25 yards had to be demoed and taken through a 60in opening beside the house and next to the pool equimpent. The roof had to be kicked and new 6x6 cedar posts installed. A trench drain was installed for 50ft and all the old underground lines had to be replaced and tied into the house system.
Shannon Burris stamped and colored this ashlar slate patio in modern Grey with light Grey highlights. She crushed this one!