10/29/2026
Chapter 2: rough-in complete.
At the Sandy Springs master bath, plumbing and electrical are finished —
twin shower valves set into the new framed wall, drains stubbed, boxes
placed. This is the work that disappears behind the tile and drywall,
and it's the work that has to be exactly right.
Next: waterproofing, then the walls close up. Follow along.
Planning a bathroom remodel? Send us a message — happy to talk through it.