Directions Website Contact the business

KCICabs Welcome to Kitchen Cabinets Inc. (KCI), your trusted cabinet provider for the multi-family housing industry.

Accessible units often look like the rest of the unit mix on the floor plan, but the kitchen cabinetry can be very diffe...
10/29/2026

Accessible units often look like the rest of the unit mix on the floor plan, but the kitchen cabinetry can be very different.

Depending on the unit type and the accessibility standards that apply to the project, these kitchens may need:
✔ Removable base cabinets to create knee space at the sink or work surface
✔ Finished floors and walls behind those removable cabinets
✔ Adjusted counter heights in certain areas
✔ Storage and hardware that are easier to reach and operate

When accessible units are identified early and tracked as their own unit type, builders avoid redesigning kitchens late in the project.

At KCI, we help builders plan cabinetry for every unit type in the mix, including accessible units.

Many cabinet disputes on multifamily projects don't start at installation. They start with an unclear scope.When the bid...
10/22/2026

Many cabinet disputes on multifamily projects don't start at installation. They start with an unclear scope.

When the bid doesn't clearly define who provides what, the gaps show up later as change orders, delays, and finger-pointing.

Before bid day, builders should clarify who's responsible for:

✔ Fillers, scribes, and end panels
✔ Crown, light rail, and decorative trim
✔ Cabinet hardware
✔ Delivery, unloading, and distribution to units
✔ Installation and final adjustments
✔ Punch work and touch-ups

A clear scope protects the budget, the schedule, and the working relationship between the builder and the cabinet partner.

At KCI, we work with builders to define the cabinet scope up front, so everyone knows exactly what's included before the project starts.

📞 (972) 641-1450 | 🌐 kcicabs.com

Cabinet buyout timing can quietly shape a multifamily project's schedule.Buy too late, and approvals, production, and de...
10/21/2026

Cabinet buyout timing can quietly shape a multifamily project's schedule.

Buy too late, and approvals, production, and delivery get squeezed against the install date. Kitchens then become the trade everyone is waiting on.

Buy too early, and cabinet details can get locked in before the floor plans, appliance selections, or unit mix are final. Changes after release are harder and more costly.

The right timing usually comes when:
✔ Unit plans and the unit mix are stable
✔ Appliance selections are confirmed
✔ Finish and hardware decisions are made
✔ There's enough time for approvals and production before install

The best approach is to work backward from the first cabinet install date and build in time for drawings, approvals, production, and delivery.

At KCI, we help builders map cabinet timelines to their construction schedule, so the cabinet package is ready when the building is.

📞 (972) 641-1450 | 🌐 kcicabs.com

10/15/2026

A mirrored floor plan may look like a copy, but the cabinet package isn't.

When a unit is flipped, several cabinet details flip with it:
✔ Door swings and hinge sides
✔ Off-center sink base locations
✔ Filler and scribe positions

✔ Finished end panel locations

If mirrored units aren't tracked as a separate unit type, cabinets can end up in the right building but the wrong kitchen.

At KCI, we plan, produce, and label mirrored unit types separately, so every kitchen installs the way it was drawn.

On multifamily projects, the order of cabinets and flooring is a sequencing decision that should be made early, not on i...
10/12/2026

On multifamily projects, the order of cabinets and flooring is a sequencing decision that should be made early, not on install day.

Cabinets installed first
✔ Less flooring material, since it stops at the cabinets
✔ No risk of damaging new flooring during cabinet install
⚠ Cabinet and counter heights must account for the finished floor height
⚠ Dishwasher openings need to be checked against the final floor

Flooring installed first
✔ A continuous floor under the cabinets
✔ Easier future cabinet replacement during renovations
⚠ More flooring material and more floor protection needed
⚠ Floating floors generally shouldn't be pinned down by cabinets

Neither approach is right for every project. What matters is that the decision is made early and communicated clearly to the cabinet, flooring, countertop, and appliance teams.

At KCI, we coordinate cabinet heights and details with the builder's install sequence, so the kitchen works with the finished floor.

📞 (972) 641-1450 | 🌐 kcicabs.com

Wall cabinets depend on something you'll never see once the kitchen is finished: blocking.Blocking gives wall cabinets s...
10/09/2026

Wall cabinets depend on something you'll never see once the kitchen is finished: blocking.

Blocking gives wall cabinets solid backing in the framing. If it's missing or in the wrong place, installers may have to open up finished drywall, which means patching, repainting, and delays.

Before drywall goes up, builders should confirm:

✔ Blocking locations match the latest cabinet elevations
✔ Heights account for upper cabinets, hoods, and microwave cabinets
✔ Tall cabinets have backing where they need to be secured
✔ Every unit type is checked, including mirrored units
✔ A quick walk of the units is done before walls close

It's a small step during framing that prevents one of the most frustrating fixes during installation.

At KCI, we help builders coordinate cabinet elevations early so framing crews know where support is needed before the walls close.

📞 (972) 641-1450 | 🌐 kcicabs.com

On a multifamily project, the mock-up unit isn't just a sample. It's a test run for every kitchen that follows.When a ca...
10/05/2026

On a multifamily project, the mock-up unit isn't just a sample. It's a test run for every kitchen that follows.

When a cabinet layout is about to be repeated across hundreds of units, the mock-up is where builders can confirm:

✔ Cabinets fit the actual framed and finished conditions
✔ Appliances, plumbing, and electrical line up as planned
✔ Finishes and hardware match what the owner approved
✔ Installers understand the sequence and the time per unit
✔ Small issues get fixed once, not hundreds of times

An issue found in the mock-up costs one correction. The same issue found after production can cost a correction in every unit.

At KCI, we treat the mock-up unit as a key checkpoint. It helps builders confirm the details before the cabinet package moves into full production.

Get the first kitchen right, and every kitchen after it gets easier.

📞 (972) 641-1450 | 🌐 kcicabs.com

Every multifamily kitchen starts long before it reaches the jobsite. It starts on the factory floor.This Manufacturing D...
10/02/2026

Every multifamily kitchen starts long before it reaches the jobsite. It starts on the factory floor.

This Manufacturing Day, we recognize the people behind every cabinet package KCI delivers. They cut, assemble, finish, check, and prepare cabinets for projects with hundreds of units.

Their work is what makes consistency possible:
✔ The same dimensions from the first unit to the last
✔ The same finish across every building
✔ Every package checked and prepared for the jobsite

KCI has been manufacturing cabinets since 1969, and our team's craftsmanship is still at the center of everything we build.

Thank you to the hands that build our cabinets and the builders who trust them in their projects.

Happy Manufacturing Day from KCI.

What happens before cabinets reach the jobsite matters just as much as what happens during installation.At KCI, every mu...
09/30/2026

What happens before cabinets reach the jobsite matters just as much as what happens during installation.

At KCI, every multifamily cabinet package goes through a process designed to ensure it is checked, verified, organized, and protected before it leaves the factory.

From production checks to order verification and jobsite-ready packaging, every step is focused on helping builders receive the right cabinets, ready for the next phase of construction.

Because successful kitchens start long before installation.

When one cabinet design is repeated across hundreds of units, even a small mistake can become a project-wide problem.Tha...
09/24/2026

When one cabinet design is repeated across hundreds of units, even a small mistake can become a project-wide problem.

That's why multifamily cabinetry demands precision at every stage—from specifications and production to delivery and installation.

At KCI, we focus on consistent dimensions, repeatable quality, and reliable cabinet packages so builders can move from the first unit to the last with confidence.

Because when you're building hundreds of kitchens, consistency isn't optional. It's essential.

Address

2353 Northwest Dallas Street
Grand Prairie, TX
75050

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when KCICabs posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to KCICabs:

Shortcuts

Share

Nearby home improvement businesses